The week the studio crossed from grammar to architecture.
Five sessions across three days produced a frozen v0.2a grammar, an interrogated SDP, and a complete Fiserv intelligence package — the parallel-agent pattern delivered cohesive multi-artifact output without manual stitching.
The Numbers
Sessions
5
Hours
19h
Files Touched
50+
Commits
8
Deploys
5
New Graphs
1
Google Docs
2
Slack Drops
2
Activity concentrated Wed–Fri. Mon Apr 20, Tue Apr 21, and the weekend had no captured sessions. Three primary projects carried the week: ShurIQ Report Studio, ShurIQ TruData, and Fiserv Prosperity GTM v3.
Wins by Project
ShurIQ Report Studio Apr 22–23 · 2 sessions
Grammar v0.2a finalized Apr 22 evening: BPS→SAS rename, §03/§04 demoted to optional, §06.9/§06.10 added, Concept vs. Competitive Stack Rank split, three new Open Decisions. Team Google Doc created for Nuri / Limore / Diana sign-off (writer permissions, anyone-with-link).
Studio prompt extended with §3.4 Command Surface — three-layer UI (hover quick-actions · slash palette · help drawer) plus a grammar-gap feedback affordance.
SDP expert-panel review Apr 23: 4 rounds × 6 agents → 8 files / ~55K words in projects/shur/shuriq-report-studio/sdp/.
Eight parallel agents produced 15+ artifacts in a single day — first time the parallel-agent pattern delivered a complete client-ready intelligence package without manual stitching.
Wait for Nuri's annotations on Intelligence Memo (post Apr 25 11am ET review)
Run pull-gdoc-comments once Nuri comments → import to vault
Capture last 2 NotebookLM URLs (slide deck + video) when fresh cURL available
Resolve 7 open questions from §9 of memo with Nuri
Commit prosperity-package/ content (vault was 7 commits ahead of origin at session end)
In Progress (TaskNotes)
One active task: Zapier MCP for Slack and CoWork · high priority · no due date.
Next Week Priorities
Top items to drive into W18 (already two days in).
Decide 6 SDP gates for ShurIQ StudioGates 3, 8, 9, 10, 11, 14. Defaults are recommended; ≤15 min if accepted. Unblocks engineering kickoff.
Pull Nuri's Fiserv memo commentsApr 25 review has happened; run pull-gdoc-comments and import annotations into vault.
Capture remaining Fiserv NotebookLM outputs2 of 5 still pending (slide deck + video); update MANIFEST.md and session-120-report.pages.dev.
Resolve Fiserv §9 open questions7 questions on GTM v3 mechanics need Nuri's call before external Josh share.
Commit prosperity-package/18+ files were uncommitted at session 120 end; vault was 7 commits ahead of origin.
Grammar v0.2a sign-offConfirm Nuri / Limore / Diana have reviewed the Google Doc; freeze for Studio prototype if no further changes.
TaskNotes triageArchive stale Jan–Feb fixtures; confirm status of Condo Sales POC and Shur-AI Coordination items.
Backlog Triage
The TaskNotes overdue list is dominated by January–February test fixtures and abandoned setup tasks. None correspond to this week's actual work streams. Highest-signal items worth revisiting or archiving:
Due
Pri
Task
Project
2026-01-30
high
Run Condo Sales POC process and share results
CondoSales
2026-02-09
high
Setup ShurAI Coordination Systems (Slack + GWS)
Shur-AI
2026-01-22
high
Review scout agent design
scout-agent-design
2026-01-30
medium
Setup Letta Agent
—
Recommendation: Triage pass — archive test fixtures (2026-01-15-blocked-example, 2026-01-20-test-pm-system, etc.), confirm whether Condo Sales / Shur-AI Coordination tasks are still live or superseded.
Project Activity
Project
Sessions
Files
Deploys
InfraNodus
ShurIQ Report Studio
2
~15
2
ecosystem map ×2
ShurIQ TruData
1
9
1 + 2 deletions
ecosystem map ×1
Fiserv Prosperity
1
18+
3
new graph + ecosystem ×1
Memory / infra
cross
4
—
—
Maintenance Actions
Archive stale test tasks:2026-01-15-blocked-example, 2026-01-20-test-pm-system, 2026-01-21-review-pm-dashboards, 2026-01-22-test-meeting-to-tasks, 2026-01-25-future-task
Triage 23 overdue items — most predate active work streams and are likely no-ops
TaskNotes hygiene: Mon/Tue/weekend sessions weren't logged; either no work happened or auto-session-capture was skipped. Confirm.
mem0/openmemory MCP tool surface:mcp.json SSE fix landed Apr 23; verify mcp__openmemory__add_memory is now available so future sessions skip REST fallback
Check prosperity-package/ commit status — was 7 commits ahead of origin at end of session 120
Insights
Patterns
Activity concentrated in a 3-day Wed–Fri window with no Mon/Tue ramp-up
Parallel-agent pattern is now repeatable: SDP review (6 agents, 4 rounds) and Fiserv package (8 agents, 1 day) both produced cohesive multi-artifact output
Three deployable web artifacts in one week — Cloudflare Pages workflow is muscle memory
What slowed progress
Wrangler silent-fail on wrong cwd cost a redeploy cycle on the progress report
NotebookLM cookie auth-drift returns success with count: 0 — silent failure burned ~30 min in the Fiserv session
Cross-account Drive permissions broke NotebookLM add_drive silently — files need anyone with link first
What went well
Memory hygiene actively worked — Limore→Nuri review chain correction landed mid-Fiserv-session and was encoded immediately
Grammar v0.3 vs. v0.2a diff confirmed v0.3 was an archival cleanup pass — caught by chronological reading rather than filename version numbers
Editorial discipline held: anti-slop, IP-layer ceiling, brand naming enforced across all 8 Fiserv agents without correction needed
Needs attention
TaskNotes is no longer load-bearing — 50-task list is mostly stale, while real work tracks through session records, handoffs, project folders
Sessions log captures the work but not the state of open decision gates — 6 SDP gates and 7 Fiserv questions live in markdown but aren't surfaced as queryable items